Studies List

Land Use: Permitted Use Letter

Imperial County letter confirming industrial zoning permits the data center "as of right."

Land Use: Notice of Exemption Grading Permit

Notice of exemption that the grading is exempt from CEQA

Land Use: Lot Merger Deemed Complete

Letter that the lot merger is deemed complete

Land Use: Permitted Use Memo

Analysis that the project is a permitted use in the County

Land Use: As of Right Data Center Memo

Listing of 25 data centers permitted as of right because they are located in an industrial zone; 14 of them in California

Electric studies: Power Engineers Memo

557 MW summer capacity on the 230 kV S-line; 108 MW summer on the 92 kV R-line.

Electric studies: IID Feasibility Study

No thermal or voltage violations for 250 MW on the 230 kV S-line.

Electric studies: IID System Impact Study 250 MW on S-line

No thermal or voltage violations; project deemed feasible.

Electric studies: IID System Impact Study 80 MW on R-line

Project is feasible with a VAR device at the new substation.

Energy Supply: Third-party energy supply proposals

(340 MW, 225 MW, 500 MW, and 500 MWh BESS)

Energy Supply: Wholesale Market Proposal

Wholesale options for interim power supply pending long-term PPAs

Energy Supply: IID Supplying 330 MW Load

IID energy rate

Energy Supply: Economic Development Rate

IID economic development rate

Energy Supply: Interconnection Queue (5 GW)

IID interconnection queue reflects over 5 GW of pending projects.

Water: El Centro Reclaimed Water Report

Draft water study; purchase is not concluded

Water: Imperial Reclaimed Water Report

Draft water study; purchase is not concluded

Biological Report

Biological Study confirming no endangered species on-site

Traffic Study

Traffic Study confirming minimal traffic use

Environmental Due Diligence

Phase 1 Environmental Report confirming no environmental issues

Natural Hazard Report

Confirming no environmental issues

Soils Report

Soils study confirming no problematic soils

Fiber Connectivity

Fiber study showing 800 Gbit connectivity AT&T - Lumen